Electrical Certificates Explained: EIC, Minor Works, Part P and EICR

Expert electrical advice from our NICEIC registered team

Need a price for your own property?

Written by Tim, NICEIC registered with 18+ years experience in Poole & Dorset · 5-star Google reviews · Same-day fixed quote, no obligation.

There are four electrical certificates you’re likely to come across, and which one you get depends on the job. New circuits, a new fuse box or a rewire get an Electrical Installation Certificate (EIC). Small changes to a circuit you already have, like an extra socket, get a Minor Works Certificate. If the work is notifiable under the Building Regulations, you also get a Building Regulations Compliance Certificate, which most people call a Part P certificate. And a check of wiring that’s already there, which is what landlords and buyers ask for, is an Electrical Installation Condition Report (EICR).

Every job we do comes with the right one at no extra charge. If you need an EICR in Poole or Bournemouth, ours start from £120. See our EICR and testing service.

Which certificate do I need?

The jobCertificate you should get
New circuit (cooker, shower, EV charger, garden office)Electrical Installation Certificate, plus the Part P certificate
New consumer unit (fuse box)Electrical Installation Certificate, plus the Part P certificate
Full or partial rewireElectrical Installation Certificate, plus the Part P certificate
Extra socket or light on an existing circuitMinor Works Certificate
Any new circuit or alteration in a bathroomEIC or Minor Works, plus the Part P certificate
Checking the wiring you already haveEICR
Like-for-like swap of a socket faceplate or light fittingUsually no certificate needed

Electrical Installation Certificate (EIC)

The EIC is the full certificate for new work. It’s made up of the certificate itself, a schedule of inspections and a schedule of test results for every circuit that was installed or changed. The test results show the circuit is properly earthed, the insulation is sound, the protective devices trip when they should and the polarity is right.

You get an EIC when we fit a new circuit, change a consumer unit or rewire a house. Keep it with your house deeds. A buyer’s solicitor will ask for it, and the next electrician who works on the house will want to see it too.

Minor Works Certificate

The Minor Electrical Installation Works Certificate is the short version. It covers an addition or alteration to a circuit that’s already there, like adding a socket to a ring, putting in an extra light, or moving a switch. It’s a single page with the test results for the circuit we worked on.

If a job adds a brand new circuit, a minor works certificate isn’t enough. You should get a full EIC. It’s worth checking that, because it’s a common shortcut.

The Part P certificate (Building Regulations Compliance Certificate)

Part P is the part of the Building Regulations in England that covers electrical safety in homes. Some jobs are notifiable, which means Building Control has to be told about them. The main ones are:

  • fitting a new circuit
  • replacing a consumer unit
  • adding to or changing a circuit in a room with a bath or shower

There are two ways to notify. If your electrician is registered with a competent person scheme, such as NICEIC, they notify the job through the scheme and you get a Building Regulations Compliance Certificate in the post. If they’re not registered, you have to apply to your council’s Building Control before the work starts and pay their fee, and they inspect it.

We’re registered with NICEIC, so we notify the work for you. You don’t need to deal with Building Control yourself.

EICR (the electrical safety certificate)

The EICR is different from the rest because it’s a check of an installation that already exists, not a certificate for new work. We inspect and test the wiring, the consumer unit, the earthing and bonding and every circuit, then write up anything we find using the standard codes:

  • C1: danger present, needs making safe straight away
  • C2: potentially dangerous, needs putting right
  • C3: improvement recommended
  • FI: further investigation needed

Any C1, C2 or FI makes the report unsatisfactory. C3s on their own don’t.

Landlords in England must have an EICR at least every five years, give a copy to tenants within 28 days, and send it to the council within 7 days if asked. Homeowners don’t have to have one, but every ten years is the usual advice, and it’s worth doing when you buy an older house. Our EICR cost guide has the full prices and what happens if a property fails.

Selling a house: which certificates the solicitor will ask for

When you sell, the property information form asks whether any electrical work has been done since 1 January 2005, which is when Part P came in. If it has, the buyer’s solicitor will want the EIC and the Building Regulations Compliance Certificate for it.

If you can’t find them:

  1. Ask the electrician who did the work for a copy.
  2. If you know which scheme they were registered with, the scheme can usually supply a copy of the Building Regulations certificate.
  3. If neither works, an EICR shows the buyer the installation is in a safe condition. It doesn’t replace the missing certificate, but it’s what most solicitors accept.

What a certificate should look like

A proper certificate has the name, address and registration number of the electrician, the address of the property, a description of the work, and a test result with the actual reading written in for every circuit. It’s signed and dated. If you’ve been given a certificate with no test results on it, ask why.

What it costs

There’s no separate charge for certificates on any job we do. They’re part of the price. For an EICR on its own:

PropertyEICR price
1-bed flatFrom £120
2-bed houseFrom £150
3-bed houseFrom £150
4 to 5 bed houseFrom £200
HMO, 4 to 6 bedroomsFrom £200

Every price we charge is on our prices page. If the EICR shows the fuse box is the problem, our consumer unit upgrades start from £450 and come with an EIC and the Part P certificate.

Book a test or ask a question

Not sure which certificate you need? Call Tim on 07809 680068 or message on WhatsApp and tell us what the job is or who’s asking for the certificate. We cover Poole, Bournemouth and the surrounding area.

Sources

Frequently Asked Questions

An Electrical Installation Certificate (EIC) is the certificate an electrician must give you after new electrical work that includes a new circuit, a new consumer unit or a rewire. It records what was installed, how it was designed and the test results for every circuit, and it is signed by the person who designed, installed and tested it.

A Minor Electrical Installation Works Certificate covers smaller changes to a circuit that already exists, such as adding a socket or a light, or moving a switch. It is a one-page certificate with the test results for the circuit that was altered. If the job adds a whole new circuit, you should get a full Electrical Installation Certificate instead.

Part P certificate is the everyday name for the Building Regulations Compliance Certificate. It shows that notifiable electrical work, such as a new circuit, a consumer unit change or work in a bathroom, was reported to Building Control. If your electrician is registered with a scheme like NICEIC, they notify it for you and the certificate is posted to you.

Yes. When landlords, letting agents and solicitors ask for an electrical safety certificate, they mean an Electrical Installation Condition Report (EICR). It is a check of an existing installation, not a certificate for new work. Ours start from £120 for a 1-bed flat and £150 for a 2 or 3 bed house.

There is no law that says you must have them to sell, but the buyer's solicitor will ask about any electrical work done since 1 January 2005, when Part P came in. Having the Electrical Installation Certificate and the Building Regulations Compliance Certificate to hand saves delays. If they are missing, an EICR is the usual way to show the installation is safe.

No. Every job we price includes the testing and the right NICEIC certificate, and we notify Building Control for you where the work needs it.

Need help with this?

Tim and his team are happy to answer questions or provide a free, no-obligation quote. 5-star Google reviews and counting.

Need Electrical Advice?